Infrastructure WorksSubcontractor2011
Sweet Water Pipeline – Contract #16 (Stage 1)
Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #16.
Client
National Water Co. (NWC)
Contract Value
SAR 28.84M
Duration
12 Months
Location
Riyadh – KSA
Project Overview
Stage 1 potable water pipeline works including full pipeline installation and all necessary associated works for the National Water Company's Riyadh water network expansion.
Contractor RoleSubcontractor
Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #16.
Photo Gallery
6 photosScope of Work
01
Water pipeline installation
02
Trench excavation and backfilling
03
Pipe jointing and pressure testing
04
Valve chamber and connection works
05
Surface reinstatement