Sweet Water Pipeline – Contract #16 (Stage 1)
Infrastructure WorksSubcontractor2011

Sweet Water Pipeline – Contract #16 (Stage 1)

Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #16.

Client
National Water Co. (NWC)
Contract Value
SAR 28.84M
Duration
12 Months
Location
Riyadh – KSA
Contract Value
SAR 28.84M
Client
National Water Co. (NWC)
Duration
12 Months
Location
Riyadh – KSA
Contractor Role
Subcontractor
Project Overview

Stage 1 potable water pipeline works including full pipeline installation and all necessary associated works for the National Water Company's Riyadh water network expansion.

Contractor RoleSubcontractor

Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #16.

Scope of Work
01

Water pipeline installation

02

Trench excavation and backfilling

03

Pipe jointing and pressure testing

04

Valve chamber and connection works

05

Surface reinstatement