Midan Alemar
Sweet Water Pipeline – Contract #15 (Stage 1)
Infrastructure WorksSubcontractor2012

Sweet Water Pipeline – Contract #15 (Stage 1)

Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.

Client
National Water Co. (NWC)
Contract Value
SAR 26.49M
Duration
24 Months
Location
Riyadh – KSA
Contract Value
SAR 26.49M
Client
National Water Co. (NWC)
Duration
24 Months
Location
Riyadh – KSA
Contractor Role
Subcontractor
Project Overview

Stage 1 potable water pipeline with site backfilling and all necessary works for the National Water Company's Riyadh network. A 24-month pipeline infrastructure project.

Contractor RoleSubcontractor

Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.

Scope of Work
01

Water pipeline installation

02

Site backfilling operations

03

Trench excavation and reinstatement

04

Valve chambers and connections

05

All necessary infrastructure works