
Infrastructure WorksSubcontractor2012
Sweet Water Pipeline – Contract #15 (Stage 1)
Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.
Client
National Water Co. (NWC)
Contract Value
SAR 26.49M
Duration
24 Months
Location
Riyadh – KSA
Project Overview
Stage 1 potable water pipeline with site backfilling and all necessary works for the National Water Company's Riyadh network. A 24-month pipeline infrastructure project.
Contractor RoleSubcontractor
Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.
Photo Gallery
6 photosScope of Work
01
Water pipeline installation
02
Site backfilling operations
03
Trench excavation and reinstatement
04
Valve chambers and connections
05
All necessary infrastructure works
Related Projects


