Infrastructure WorksSubcontractor2011
Water Pipeline – Contract #2
Engaged as Subcontractor for water pipeline and concrete basin works, Contract #2.
کلائنٹ
National Water Co. (NWC)
معاہدہ قدر
SAR 22.78M
مدت
12 Months
مقام
Riyadh – KSA
منصوبے کا جائزہ
Water pipeline installation including concrete basins and all necessary civil works for the National Water Company's infrastructure network in Riyadh.
ٹھیکیدار کا کردارSubcontractor
Engaged as Subcontractor for water pipeline and concrete basin works, Contract #2.
فوٹو گیلری
6 تصاویرکام کا دائرہ
01
Water pipeline installation
02
Reinforced concrete basin construction
03
Trench excavation and backfilling
04
Pressure testing and commissioning
05
Surface reinstatement