Infrastructure WorksSubcontractor2012
Sweet Water Pipeline – Contract #15 (Stage 1)
Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.
کلائنٹ
National Water Co. (NWC)
معاہدہ قدر
SAR 26.49M
مدت
24 Months
مقام
Riyadh – KSA
منصوبے کا جائزہ
Stage 1 potable water pipeline with site backfilling and all necessary works for the National Water Company's Riyadh network. A 24-month pipeline infrastructure project.
ٹھیکیدار کا کردارSubcontractor
Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.
فوٹو گیلری
6 تصاویرکام کا دائرہ
01
Water pipeline installation
02
Site backfilling operations
03
Trench excavation and reinstatement
04
Valve chambers and connections
05
All necessary infrastructure works