Midan Alemar
Sweet Water Pipeline – Contract #15 (Stage 1)
Infrastructure WorksSubcontractor2012

Sweet Water Pipeline – Contract #15 (Stage 1)

Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.

کلائنٹ
National Water Co. (NWC)
معاہدہ قدر
SAR 26.49M
مدت
24 Months
مقام
Riyadh – KSA
معاہدہ قدر
SAR 26.49M
کلائنٹ
National Water Co. (NWC)
مدت
24 Months
مقام
Riyadh – KSA
ٹھیکیدار کا کردار
Subcontractor
منصوبے کا جائزہ

Stage 1 potable water pipeline with site backfilling and all necessary works for the National Water Company's Riyadh network. A 24-month pipeline infrastructure project.

ٹھیکیدار کا کردارSubcontractor

Engaged as Subcontractor for Stage 1 of the sweet water pipeline, Contract #15, including site backfilling.

کام کا دائرہ
01

Water pipeline installation

02

Site backfilling operations

03

Trench excavation and reinstatement

04

Valve chambers and connections

05